skip to main | skip to sidebar

level plumb square

...let each one take care how he builds upon it. For no one can lay a foundation other than that which is laid, which is Jesus Christ...1 Corinthians 3:10+11

Friday, November 30, 2007

C.H.E. #8 second floor decking




Posted by t-mcnamara at 7:42 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

About

Documenting the progress of our labor, the challenges along the way, and other things building related.

Links

  • Breaktime
  • Carole
  • Fine Homebuilding
  • JLC forums

Blog Archive

  • ▼  2007 (116)
    • ►  December (7)
    • ▼  November (13)
      • C.H.E. #8 second floor decking
      • C.H.E. #8 Framing the second floor
      • C.H.E. #8 Bonus room floor
      • C.H.E. #8 First floor interior walls
      • C.H.E. #8 Breakfast room gable wall
      • C.H.E. #8 First floor walls
      • C.H.E. #8 Garage walls
      • C.H.E. #8 First floor
      • C.H.E. #8 Framing the first floor
      • Forklift maintenance
      • C.H.E. #8 Setting the steel
      • Visiting Dad at the jobsite
      • C.H.E. #8 Getting it square
    • ►  October (7)
    • ►  September (1)
    • ►  June (7)
    • ►  May (4)
    • ►  April (13)
    • ►  March (19)
    • ►  February (22)
    • ►  January (23)
  • ►  2006 (11)
    • ►  December (10)
    • ►  September (1)
  • ►  2005 (2)
    • ►  November (1)
    • ►  July (1)
  • ►  2004 (3)
    • ►  October (1)
    • ►  August (1)
    • ►  May (1)
  • ►  2003 (1)
    • ►  September (1)

Labels

  • Lot 613 (75)
  • rough framing (13)
  • Lot 31 (8)
  • carpentry (7)
  • new home construction (7)
  • Floor framing (3)
  • Lasers (3)
  • wall framing (3)
  • Foundations (2)
  • roof framing (2)
  • Lot 22 (1)
  • Lot 408 (1)
  • Walls (1)
  • articles (1)
  • lot 2 (1)
  • routers (1)